PROPOSED 1,200MW – 1,400MW GAS FIRED COMBINED CYCLE POWER PLANT IN TG. AGAS, PEKAN, PAHANG, MALAYSIA
PEKAN POWER PLANT SDN BHD
201701025205 (1239371-W)
ppp_logo
PEKAN POWER PLANT specialies in engineering, procurement, structural/piping fabrication, electrical installation, precommissioning and commissioning activities.
We provide skilled personnel to the Oil and Gas industry for both onshore and offshore projects and facilities, from engineering and design, fabrication and construction, installation and commissioning, through to complete inspection and maintenance.
We are specialised in Combined Cycle Power Plant. A combined-cycle power plant uses both a gas and a steam turbine together to produce up to 50 percent more electricity from the same fuel than a traditional simple-cycle plant. The waste heat from the gas turbine is routed to the nearby steam turbine, which generates extra power.
We are specialised in Supply, Fabrication and Installation of steel structures, piping and ducting, steel storage and other special fabricated items. Fabrication of transmission & communication towers, cable ladders, industrial accessories and lighting columns.

The oil, gas and energy sector plays a crucial role in global economic and social development and will continue to do in the future. However, fossil fuels are also majorly responsible for harming the ecosystem and consequently, are under tight control.

wp_partner

Our Partner

Address: (32140) 285, jungang-ro, taean-eup,
taeangun, chungchengnam-do, Republic of Korea

Website: www.iwest.co.kr

Korea Western Power CO., Ltd. (KOWEPO)
Korea Western Power Co., Ltd.(KOWEPO), a leading supplier and innovator in the 21st century Korean power industry, started its power business in April 2001. KOWEPO takes up approximately 8.7% of the national generating capacity mostly comprised of thermal and combined cycle. KOWEPO was initiated in separation from Korea Electric Power Corporation under the Korea Power Industry Restructuring Act. KOWEPO is now in the process of deregulation and privatization process. KOWEPO has about 2,350 employees and its head office is located in Taean-gun, Chungcheongnam-do, Republic of Korea.

 

PROPOSED 1,200MW – 1,400MW GAS FIRED COMBINED CYCLE POWER PLANT IN TG. AGAS, PEKAN, PAHANG, MALAYSIA